Testing and Commissioning

Before dispatch, all power factor correction systems are tested as follows:

  • Insulation check – 2,000 Volt for 15 Seconds ph-ph and Earth
  • All connections and joints checked
  • Capacitance and wiring check of each step
  • Reactive relay setup and test
  • Full load current check of each step including harmonic checks
  • Completion of test/commissioning report.